BACA & Paint

There is a BACA meeting tonight but I will not be in attendance as I have some pressing paint duties. I’ve been painting my house for what seems like a month. I have formed these big nasty callouses all on my hands and I want them gone.
I have told myself I need to finish all my paint jobs by the end of this week, or else I’ll go nuts. First thing that needs to be done tonight (thus not going to the BACA meeting) is the bathroom ceiling needs a coat of paint. There are only so many times you can shower without damaging the ceiling. I hope it is not too late as there are some funny looking marks up there already.
After the bathroom everything else is whenever but I got to end this painting. The baseboards on the 1st floor need a coat, because the paint I put on was damaged by the floor guy’s sander. Also on the first floor I need to paint over the ceiling paint that hit the wall and the doorway between the kitchen and dining area. Upstairs I have to decide if I’m painting the bedroom ceilings or just leaving it primer white. Sections of the brick wall need caulking and painting. The top part of the 2nd floor baseboards need a lick of paint. The top of the wall near the ceilings in both bedrooms and the hallway need paint.
Then once I’m done painting, there is the cleaning.